Guyana's Fifth Oil Project, Uaru, Starts Production with Errea Wittu FPSO
The Ministry of Natural Resources (MNR) announced the commencement of Guyana's fifth oil project, Uaru, which utilizes the Errea Wittu Floating Production, Storage and Offloading (FPSO) vessel. This development is expected to increase Guyana's daily crude output to approximately 1.15 million barrels per day by 2027, with ExxonMobil Upstream Company President Dan Ammann calling the startup a major milestone. This development is expected to increase Guyana's daily crude output to approximately 1.15 million barrels per day by 2027, with ExxonMobil Upstream Company President Dan Ammann calling the startup a major milestone.
According to Kaieteur News, the Ministry of Natural Resources (MNR) announced on November 17, 2026, that Guyana's fifth oil project, Uaru, has started production. This initiative is anticipated to elevate the nation's daily capacity beyond one million barrels per day.
The Errea Wittu Floating Production, Storage and Offloading (FPSO) vessel, which is the fifth facility constructed by the Japanese shipbuilder MODEC in Guyana, will operate under the Uaru Petroleum Production Licence that was granted on April 27, 2023. The Errea Wittu is projected to yield around 250,000 barrels of oil per day (bpd), contributing to Guyana's total daily crude output, which is expected to rise from slightly over 900,000 bpd to approximately 1.15 million bpd by 2027. This production will integrate the development of the Snoek, Mako, and Uaru resources alongside output from 44 production and injection wells across up to 10 drill centers.
MNR stated that the Errea Wittu is situated approximately 200 kilometres offshore Guyana. The ministry further detailed that the vessel possesses a crude oil storage capacity of about two million barrels and is built on a new-build hull, moored using a SOFEC spread mooring system. Its topsides are designed to manage up to 540 million cubic feet of associated gas daily and support water injection up to 350,000 barrels per day.
Beyond increased production and revenue, the government highlighted expanded benefits of the sector, including greater investments across key economic sectors, employment opportunities for Guyanese, increased involvement of local businesses, and the growth of other industries, which the MNR anticipates will continue to foster opportunities for Guyana's long-term development.
The MNR conveyed its congratulations to the Stabroek Block licence holders on this substantial accomplishment, while affirming its dedication to the responsible management of the country's petroleum resources. The ministry also assured that the sector's growth will remain guided by sound management, prioritizing sustainable development and responsible environmental stewardship for the lasting benefit of the Guyanese people.
In a separate statement, ExxonMobil Guyana Limited (EMGL) explained that the fifth project will raise Guyana's installed production capacity to 1.1 million barrels per day. EMGL noted that the Errea Wittu FPSO joins Guyana's existing fleet, which includes the Destiny, Unity, Prosperity, and ONE GUYANA.
ExxonMobil Upstream Company President Dan Ammann characterized the project's commencement as another “major milestone” for the company and Guyana.