President Dr Irfaan Ali Urges Parliamentarians to Uphold Oath Before Bridge Commissioning Amid Ongoing Police Investigations into Infrastructure Attacks
President Dr Irfaan Ali called on parliamentarians to uphold their oaths of office while police investigations into plots to attack national infrastructure continue. The Guyana Police Force has uncovered plans for further attacks following a firebomb incident at the GPL Good Hope Distribution Substation.
Based on reporting by Guyana Times:
President Dr Irfaan Ali made an appeal before the commissioning of the new Samuel Hinds Mackenzie-Wismar Bridge in Region 10, urging parliamentarians to uphold their oaths of office and protect the country, warning against actions that could undermine national interests. Ali expressed blessings for the country, its leaders, and its Parliament, adding a wish for God to inspire every parliamentarian to adhere to their oath and prevent actions that could destroy it to protect and preserve the country.
These remarks were made while police investigations are ongoing into a scheme to strike critical national infrastructure, which followed a firebomb attack on the Guyana Power and Light (GPL) Good Hope Distribution Substation, located on the East Coast of Demerara (ECD) on November 10. Crime Chief Wendell Blanhum stated that the Guyana Police Force (GPF) has since uncovered plans for additional attacks targeting electricity infrastructure, a school on the East Coast, and the Umana Yana.
Speaking on Monday at the launch of the Force’s Christmas Policing Initiative at Eve Leary, Georgetown, Blanhum revealed that six individuals are currently in police custody as investigators continue their probe. He disclosed that investigators uncovered an alleged plan to simultaneously attack another GPL substation in Georgetown, which was intended to be followed by unrest during a predicted power outage. Furthermore, a school on the East Coast was allegedly the target of three separate attempted arson attacks. Blanhum mentioned that the police had secured High Court authorization to detain the six suspects further as the investigation proceeds, though no specific timeline has been provided for when charges might be filed.
In connection with the Good Hope incident, Shane Fordyce, who is married to We Invest in Nationhood (WIN) Member of Parliament (MP) Natasha Singh-Lewis, has been arrested and is being questioned. This development followed a search of Singh-Lewis’s residence in Herstelling, East Bank Demerara (EBD), during which police seized various electronic devices, including audio recorders, flash drives, and laptops. WIN is led by Azruddin Mohamed, who is currently on remand facing cybercrime charges and is sanctioned and indicted by the United States (US).
On November 10, GPL released surveillance footage showing two men arriving at its Good Hope Distribution Substation on a motorcycle. One of the men was observed throwing an ignited bottle containing a suspected flammable substance towards the facility before both men fled. Police have since recovered a motorcycle believed to have been utilized in the attack. President Ali had previously indicated that intelligence gathered prior to the incident prompted security preparations, stating in a national security statement that information suggested the attack on the GPL facility and potential attacks at other sites might have been discussed at a previous meeting. He also noted that two politically affiliated individuals were captured in conversation days before the incident, discussing the creation of an incendiary device, and asserted that those responsible, including any orchestrators, would be pursued.
GPL had previously cautioned that a successful assault on the Good Hope facility could have caused substantial damage to the country’s electricity infrastructure and put nearby residents and workers at risk. The company explained that the substation is part of its 69-kilovolt (kV) network, and a major disruption could have led to a shutdown of the Demerara-Berbice Interconnected System, impacting over 220,000 customers. However, electricity supply was not interrupted, and subsequent inspections found no major equipment damage.